Project Description
The installation at Muller Camberley was to provide and install cooling into the new switch room. 2 x 10kW wall mounted split systems have been installed and commissioned by Universal Cooling. Each system c/w a painted internal drip tray and tank pump. Interfaces have been installed to allow the systems to duty rotate and have their operation monitored by the intelligent BMS.